Tuesday, 23 October 2012

Day 1!!!
So on my first day I was excited and nervous. I went into reception to be greeted by the friendly face of the receptionist. She gave me my badge and a copy of the Health and Safety Leaflet which I had to sign. Lorraine one of my supervisors met me in reception, we than set out on the ten minute walk to the building I will be working in. When we got to the building after walking through a really long glass walled corridor I was introduced to the team I would be working in. 
We had great fun at lunch everyone sharing stories of funny incidents that happened to them.
After lunch I helped test failed PEN heads that failed the inspection test. I went to the printing bank with James and put the failed PEN heads in specially modified printers. After that Aoife gave me a tour of the production line and showed me how each machine worked and what they did.

No comments:

Post a Comment